 |
|
Basics & Express |
|
 |
|
 |
The RosettaNet Basics and Express Programs
enabled the affordable adoption of RosettaNet standards for small- to medium-sized
companies.
| |
 |
|
Collaborative Forecasting - Phase 1 |
|
 |
|
 |
The Collaborative Forecasting Program
allowed trading partners to improve the match between supply and demand.
| |
 |
|
Collaborative Forecasting - Phase 2 |
|
 |
|
 |
The Collaborative Forecasting Program will
extend the forecasting process capabilities to improve the match between supply and demand.
| |
 |
|
Design Engineering Information |
|
 |
|
 |
The Design Engineering Information Program
will send technical design information to reduce analysis and selection time and to improve
product promotion efficiency.
| |
 |
|
Design Win - Phase 1 |
|
 |
|
 |
The Design Win program automated
registration and approvals to improve the effectiveness of the design win process.
| |
 |
|
Design Win - Phase 2 |
|
 |
|
 |
The Design Win Program deploys Design Win
standards to improve channel efficiency, automate and expedite data collection and sharing.
| |
 |
|
Direct Ship/3PL |
|
 |
|
 |
The Forecasted Inventory Management Program
will improve the stability of inventory supply and reduce shortages and excessive stock.
| |
 |
|
Forecasted Inventory Management |
|
 |
|
 |
The Forecasted Inventory Management Program will improve the stability of inventory supply and
reduce shortages and excessive stock.
| |
 |
|
Global Billing |
|
 |
|
 |
The Global Billing Milestone Program will validate and add any new, necessary functionality to
existing RosettaNet invoicing and payment PIPs® to support global billing.
| |
 |
|
iHub |
|
 |
|
 |
The iHub program identified a set of business information needed to improve the match between
supply and demand.
| |
 |
|
Manufacturing WIP - Phase 2 |
|
 |
|
 |
The Manufacturing Work-In-Process (WIP) Program will automate manufacturing factory floor
information exchanges to reduce inventories and allow for more flexible operations.
| |
 |
|
Manufacturing Work Order |
|
 |
|
 |
The Manufacturing Work Order Program provides the ability to release orders to the factory floor
with the supporting manufacturing process information.
| |
 |
|
Material Release |
|
 |
|
 |
This program's goal validate the Material Release (PIP 4D1) as part of the replenishment use case
defined by the RosettaNet Collaborative Forecasting Program.
| |
 |
|
Order Management Japan - Advanced |
|
 |
|
 |
This program continues enhancement activities of the OMJ (2001) and OMJ Extended (2002) programs to
further accelerate the adoption of RosettaNet standards in the global supply chain process of
electronic components by strong leadership and collaborative resolution by member companies.
| |
 |
|
Order Management - Phase 2 (SM) |
|
 |
|
 |
The Order Management Program will extend the purchase order process capabilities and increase
implementations by Semiconductor Manufacturing trading partners.
| |
 |
|
Order Management in Japan - Extended |
|
 |
|
 |
The Order Management in Japan Program will extend the order process capabilities to increase the
supply-chain effectiveness and accelerate RosettaNet standards adoption.
| |
 |
|
Order Management in Japan - Phase 1 |
|
 |
|
 |
The Order Management in Japan program implemented purchase order processes in Japan-based
companies.
| |
 |
|
Payment |
|
 |
|
 |
The Payment Program developed a simple payment process to streamline reconciliation of accounts
receivable and improve the payment information flow for faster cash. Business and institution
benefits will be achieved by this e-business process that has the objectives of reducing processing
costs through automating accounts receivable reconciliation and improving the flow of payment
information.
| |
 |
|
Price and Availability |
|
 |
|
 |
Automate and standardize process for
requesting real time price and availability from suppliers (product providers).
| |
 |
|
Product Catalog Information |
|
 |
|
 |
The Product Catalog
Information program seeks to exchange product information to enable buyers to manage the
procurement of a specific item from a seller.
| |
 |
|
Product Information Exchange |
|
 |
|
 |
The Product Information Exchange program standardized the access to technical information for all
phases of electronic assembly, design and manufacture.
| |
 |
|
Semiconductor Manufacturing |
|
 |
|
 |
The Semiconductor Manufacturing Program
concentrated on process implementations support Materials Management, Order Management and WIP
Management.
| |
 |
|
Semiconductor Test Data Exchange |
|
 |
|
 |
The program aims to design a standards based process for transmitting Semiconductor test data from
manufacturing fabricators (FABS) to foundry customers: Fabless Semiconductor Companies (FSC). The
objectives are to improve information flow, data integrity and to reduce the costs, for both the
customer and the foundry, of managing the associated business processes that generate and utilize
the data.
| |
 |
|
Ship from Stock - Phase 1 |
|
 |
|
 |
The Ship from Stock Program developed the total ship from stock and debit/credit process and
automated the first part of the business scenario in 2001.
| |
 |
|
Ship From Stock - Phase 2 |
|
 |
|
 |
The Ship from Stock Program will automate the full business scenario to significantly reduce the
number of manual transactions and improve days to payment.
| |
 |
|
Ship Notice |
|
 |
|
 |
The Ship Notice Program is automating the
advanced ship notice exchange providing early warning and improved cycle time.
| |
 |
|
Telecommunications Order To Cash (Phase 1) |
|
 |
|
 |
Applies Order To Cash e-business process
model to the telecommunications industry.
| |
 |
|
Warranty |
|
 |
|
 |
The Warranty Program automates the warranty claims process to eliminate redundant data entry and
improve the warranty information quality.
| |
 |
|
Engineering Information Management |
|
 |
|
 |
The Engineering Information Management
program aims to migrate the exchange of engineering information from a paper to electronic
format.
| |
 |
|
Material Composition Milestone Program |
|
 |
|
 |
The high-tech industry needs to know the
material composition of their products to satisfy legislation, drive environmental improvements in
design, and be capable of providing information for customers and stakeholders when
required.
| |
 |
|
RosettaNet Automated Enablement (RAE) |
|
 |
|
 |
Proposal for RosettaNet offer a scalable and flexible architecture that makes it a
viable solution for even the smallest and least technically advanced trading partner.
| |
 |
|
Semiconductor In-Line Process Data Exchange |
|
 |
|
 |
Enable foundry and assembly Process partners
to deliver summarized Process data to chip designers for data analysis. This does not include
actual tool data, but measurement data only from the wafer fab and test assembly.
| |
 |
|
Shipment Booking and Status |
|
 |
|
 |
Develop bi-directional communication between
shippers, logistics providers and transportation providers in order to send initial pre-booking,
acknowledgement, and confirmation of actual booking of shipments, booking cancellation, and
shipment status.
| |